A factory built for made-to-drawing wine cabinets.
JIUFU designs and manufactures custom refrigerated wine cabinets and wine walls in Zhongshan, Guangdong. With more than 15 years in custom refrigeration and customers in over 60 export markets, we build only to our clients’ drawings: there is no standard catalogue.
Engineering, sheet-metal fabrication, cooling assembly and testing happen under one roof, so one-off feature pieces and OEM series go through the same process and the same checks.
Factory tour, 1 min 16 s
From drawing to finished cabinet
Filmed on our own factory floor. Sampling takes about 3 weeks; production 3–6 weeks after sign-off.

Engineering
Every cabinet starts as a drawing. Our engineers lay out racking, cooling and ventilation, then send shop drawings for your sign-off.

Laser cutting
Sheet metal for carcasses, frames and interiors is laser-cut to the dimensions on the signed drawing.

CNC punching
Vent slots, cable routes and fixing holes are punched on CNC turret machines for consistent part-to-part accuracy.

Bending & forming
A line of CNC press brakes folds panels and profiles, so one-off sizes cost no more effort than series parts.

Shearing
Large panels are sheared to size before forming, keeping long wine-wall sections straight and square.

Welding & sub-assembly
Frames are welded and sub-assemblies prepared in a dedicated area before they move to final assembly.
Shop drawings in 48 hours
Send a DWG, PDF, SketchUp file or a dimensioned sketch. We return drawings like these for you to sign off before anything is built. 3D renders are available as a paid option.




What we check before dispatch
Every cabinet is assembled, powered up and inspected on the factory floor. Each comes with a 2-year warranty.

Electrical safety test
Wiring and power supply checked with an insulation resistance tester before dispatch.

Cooling unit assembly
Compressor and twin-fan cooling unit fitted and wired inside the cabinet head.

Air distribution
Mirror-finish stainless interior with vent slots that spread cold air evenly across the shelves.

Circulation fans
Fan grilles positioned in the interior panels to keep temperature consistent from top to bottom.

Door profiles
Insulated glass doors with continuous seals, checked for fit before the cabinet leaves the line.

Final lighting check
Finished cabinets are powered up and lit on the factory floor for inspection before crating.
Talk to the factory directly
No. 76, Xingpu Rd., Huangpu, Zhongshan, Guangdong 528400, China. Trade inquiries only. We reply within 24 hours.