About JIUFU

A factory built for made-to-drawing wine cabinets.

JIUFU designs and manufactures custom refrigerated wine cabinets and wine walls in Zhongshan, Guangdong. With more than 15 years in custom refrigeration and customers in over 60 export markets, we build only to our clients’ drawings: there is no standard catalogue.

Engineering, sheet-metal fabrication, cooling assembly and testing happen under one roof, so one-off feature pieces and OEM series go through the same process and the same checks.

Factory tour, 1 min 16 s

15+Years in custom refrigeration
60+Export markets
5Units MOQ per OEM design
2 yrWarranty
How we build

From drawing to finished cabinet

Filmed on our own factory floor. Sampling takes about 3 weeks; production 3–6 weeks after sign-off.

Engineering at the JIUFU factory
01

Engineering

Every cabinet starts as a drawing. Our engineers lay out racking, cooling and ventilation, then send shop drawings for your sign-off.

Laser cutting at the JIUFU factory
02

Laser cutting

Sheet metal for carcasses, frames and interiors is laser-cut to the dimensions on the signed drawing.

CNC punching at the JIUFU factory
03

CNC punching

Vent slots, cable routes and fixing holes are punched on CNC turret machines for consistent part-to-part accuracy.

Bending & forming at the JIUFU factory
04

Bending & forming

A line of CNC press brakes folds panels and profiles, so one-off sizes cost no more effort than series parts.

Shearing at the JIUFU factory
05

Shearing

Large panels are sheared to size before forming, keeping long wine-wall sections straight and square.

Welding & sub-assembly at the JIUFU factory
06

Welding & sub-assembly

Frames are welded and sub-assemblies prepared in a dedicated area before they move to final assembly.

Engineering

Shop drawings in 48 hours

Send a DWG, PDF, SketchUp file or a dimensioned sketch. We return drawings like these for you to sign off before anything is built. 3D renders are available as a paid option.

JIUFU engineering drawing: Two-door front elevation with bottle layout
Two-door front elevation with bottle layout
JIUFU engineering drawing: Two-door cabinet, isometric view
Two-door cabinet, isometric view
JIUFU engineering drawing: Single-door display column for spirits
Single-door display column for spirits
JIUFU engineering drawing: Angled bottle rack, isometric view
Angled bottle rack, isometric view
Quality control

What we check before dispatch

Every cabinet is assembled, powered up and inspected on the factory floor. Each comes with a 2-year warranty.

Electrical safety test: Wiring and power supply checked with an insulation resistance tester before dispatch.

Electrical safety test

Wiring and power supply checked with an insulation resistance tester before dispatch.

Cooling unit assembly: Compressor and twin-fan cooling unit fitted and wired inside the cabinet head.

Cooling unit assembly

Compressor and twin-fan cooling unit fitted and wired inside the cabinet head.

Air distribution: Mirror-finish stainless interior with vent slots that spread cold air evenly across the shelves.

Air distribution

Mirror-finish stainless interior with vent slots that spread cold air evenly across the shelves.

Circulation fans: Fan grilles positioned in the interior panels to keep temperature consistent from top to bottom.

Circulation fans

Fan grilles positioned in the interior panels to keep temperature consistent from top to bottom.

Door profiles: Insulated glass doors with continuous seals, checked for fit before the cabinet leaves the line.

Door profiles

Insulated glass doors with continuous seals, checked for fit before the cabinet leaves the line.

Final lighting check: Finished cabinets are powered up and lit on the factory floor for inspection before crating.

Final lighting check

Finished cabinets are powered up and lit on the factory floor for inspection before crating.

Visit or contact us

Talk to the factory directly

No. 76, Xingpu Rd., Huangpu, Zhongshan, Guangdong 528400, China. Trade inquiries only. We reply within 24 hours.